Oddernes Tunnel

  • Project:
  • Oddernes Tunnel
  • Construction period:
  • 2001-2004
  • Client:
  • Statens Vegvesen
  • (Norwegian Road Administration)
  • Consultant:
  • SCC Scandiaconsult
  • Contractor:
  • AF Veidekke, Br. Reme
  • Products used:
  • HRC 120+ HRC 180
  • T-Headed stirups with 180 Hook, used as shear reinforcement in the tunnel roof

A look at reinforcement of tunnel roof

Installing T-headed bars as shear reinforcement in tunnel roof

Close look at the reinforcement of the tunnel roof