Maasvlakte Power Plant

  • Project:
  • Maasvlakte Power Plant (MPP3),
    The Netherlands
  • Construction period:
  • 2008-2009
  • Client:
  • E.ON Kraftwerke GmbH
  • Consultant:
  • E.ON Engineering GmbH
  • Contractor:
  • Haverkort Voormolen BV
  • Products used:
  • HRC T-headed bars

Construction site

Base plate with T-headed shear reinforcement

Placing of T-headed shear reinforcement